GEOGRAPH logo

Update Project Cost by Importing Rate Sheets Using Project Planner

Another way to load rate sheet material-unit data is to import it directly from a vendor-provided rate sheet csv file. To import a file containing a vendor rate sheet, click the “Import Unit Rates” button in the Material Catalog window. This will open a dialog window that can be used to locate and import an existing csv file on the user’s computer.

For more, check out this article on our support portal.